2016-2017: In collaboration with Stantec, this student team developed a concept-level design and feasibility analysis for a structural deck over Cabot Yard in South Boston, MA to enable real-estate development over the active rail yard. After preparing a site map…
Elm Street Dam Removal Design, Kingston MA
2015-2016: In collaboration with Stantec and the Jones River Watershed Association (JRWA), this student team designed plans for the removal of the Elm Street Dam in Kingston, MA. The dam currently blocks the head-of-tide flow from Cape Cod Bay, inhibits…