Springfield Water and Sewer Commission Team: Lilies Tencic, Brooke Testa, Clara Merry, Karina Padilla
2025-2026: In collaboration with the Springfield Water and Sewer Commission (SWSC), this student team assessed 49 culverts along Cobble Mountain Road in Granville, Russell, and Blandford, MA. Using that assessment, the team created a prioritized list of culverts for replacement and redesigned the highest-priority culvert.
The team conducted site analyses to understand the surrounding environment and relative conditions of the culverts, then ranked them according to parameters indicative of culvert quality. Using HEC-HMS hydrologic modeling software, the team analyzed the worst-ranked culverts to determine peak flows during storm events. Informed by the hydrographs and liaison input, the team identified the culvert most in need of replacement. To generate a redesign, the team completed an alternatives analysis comparing feasible options based on hydraulic performance, constructability, and cost effectiveness. The team also conducted a HEC-RAS rain-on-grid model of the Cobble Mountain Reservoir watershed to estimate spillway flows during different storm events. Deliverables included a prioritized culvert list, a drawing package, permitting requirements, a cost estimate, and watershed flow information for future planning.