{"id":345,"date":"2014-03-14T01:18:15","date_gmt":"2014-03-14T01:18:15","guid":{"rendered":"https:\/\/www.science.smith.edu\/designclinic\/?p=345"},"modified":"2022-07-12T14:06:36","modified_gmt":"2022-07-12T14:06:36","slug":"design-of-a-flow-measurement-system-for-avery-brook","status":"publish","type":"post","link":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/","title":{"rendered":"Design of a Flow Measurement System for Avery Brook"},"content":{"rendered":"<div id=\"attachment_346\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW.jpg\"><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-346\" class=\"size-medium wp-image-346\" alt=\"Northampton Department of Public Works\" src=\"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW-300x200.jpg\" width=\"300\" height=\"200\" \/><\/a><p id=\"caption-attachment-346\" class=\"wp-caption-text\"><u>Northampton DPW Team<\/u>: Marice Uy, Joyce Cheung, Najia Ahmed, Perditha Sloan<\/p><\/div>\n<p>2008-2009: In collaboration with the Northampton Department of Public Works (DPW), this student team designed an automated system to measure, record, and transmit stream flow data for Avery Brook, the main tributary into the primary water supply reservoir for the City of Northampton, MA. \u00a0The project was motivated by DPW staff who can use stream discharge data for resource planning and Smith researchers studying the area&#8217;s hydrology, geochemistry, and ecology.<\/p>\n<p>The team conducted a hydrologic analysis of Avery Brook to determine peak flows and range of flows.\u00a0 To accommodate these flows, the team designed a system that combines a v-notched weir for low flows and a Parshall flume for high flows; both the weir and flume are paired with pressure transducers to collect flow data.\u00a0 The team selected a data box for collecting data, identified spread spectrum radio as the most suitable transmission process, and determined the power requirements for the site.\u00a0 Deliverables to the DPW included construction drawings and specifications for the weir and flume, specifications for the pressure transducers and transmission devices, and a cost estimate for the electrical components.<\/p>\n<p>Following permitting applications, the Northampton DPW oversaw construction of the final design, with funding from Smith College.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2008-2009: In collaboration with the Northampton Department of Public Works (DPW), this student team designed an automated system to measure, record, and transmit stream flow data for Avery Brook, the main tributary into the primary water supply reservoir for the&hellip; <\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ngg_post_thumbnail":0,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[16,49],"tags":[],"class_list":["post-345","post","type-post","status-publish","format-standard","hentry","category-2008-2009","category-northampton-department-of-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Design of a Flow Measurement System for Avery Brook - DesignClinic<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design of a Flow Measurement System for Avery Brook - DesignClinic\" \/>\n<meta property=\"og:description\" content=\"2008-2009: In collaboration with the Northampton Department of Public Works (DPW), this student team designed an automated system to measure, record, and transmit stream flow data for Avery Brook, the main tributary into the primary water supply reservoir for the&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/\" \/>\n<meta property=\"og:site_name\" content=\"DesignClinic\" \/>\n<meta property=\"article:published_time\" content=\"2014-03-14T01:18:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-12T14:06:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW-300x200.jpg\" \/>\n<meta name=\"author\" content=\"showe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"showe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/\"},\"author\":{\"name\":\"showe\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/#\\\/schema\\\/person\\\/479988d6e7c76d78aa178583ac138d1e\"},\"headline\":\"Design of a Flow Measurement System for Avery Brook\",\"datePublished\":\"2014-03-14T01:18:15+00:00\",\"dateModified\":\"2022-07-12T14:06:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/\"},\"wordCount\":227,\"image\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2015\\\/03\\\/0809_NDPW-300x200.jpg\",\"articleSection\":[\"2008-2009\",\"Northampton Department of Public Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/\",\"url\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/\",\"name\":\"Design of a Flow Measurement System for Avery Brook - DesignClinic\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2015\\\/03\\\/0809_NDPW-300x200.jpg\",\"datePublished\":\"2014-03-14T01:18:15+00:00\",\"dateModified\":\"2022-07-12T14:06:36+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/#\\\/schema\\\/person\\\/479988d6e7c76d78aa178583ac138d1e\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2015\\\/03\\\/0809_NDPW.jpg\",\"contentUrl\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/wp-content\\\/uploads\\\/sites\\\/16\\\/2015\\\/03\\\/0809_NDPW.jpg\",\"width\":1800,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/2014\\\/03\\\/14\\\/design-of-a-flow-measurement-system-for-avery-brook\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Design of a Flow Measurement System for Avery Brook\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/#website\",\"url\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/\",\"name\":\"DesignClinic\",\"description\":\"Smith College Engineering Capstone Course\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/#\\\/schema\\\/person\\\/479988d6e7c76d78aa178583ac138d1e\",\"name\":\"showe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g\",\"caption\":\"showe\"},\"url\":\"https:\\\/\\\/www.science.smith.edu\\\/designclinic\\\/author\\\/showe\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design of a Flow Measurement System for Avery Brook - DesignClinic","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/","og_locale":"en_US","og_type":"article","og_title":"Design of a Flow Measurement System for Avery Brook - DesignClinic","og_description":"2008-2009: In collaboration with the Northampton Department of Public Works (DPW), this student team designed an automated system to measure, record, and transmit stream flow data for Avery Brook, the main tributary into the primary water supply reservoir for the&hellip;","og_url":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/","og_site_name":"DesignClinic","article_published_time":"2014-03-14T01:18:15+00:00","article_modified_time":"2022-07-12T14:06:36+00:00","og_image":[{"url":"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW-300x200.jpg","type":"","width":"","height":""}],"author":"showe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"showe","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#article","isPartOf":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/"},"author":{"name":"showe","@id":"https:\/\/www.science.smith.edu\/designclinic\/#\/schema\/person\/479988d6e7c76d78aa178583ac138d1e"},"headline":"Design of a Flow Measurement System for Avery Brook","datePublished":"2014-03-14T01:18:15+00:00","dateModified":"2022-07-12T14:06:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/"},"wordCount":227,"image":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#primaryimage"},"thumbnailUrl":"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW-300x200.jpg","articleSection":["2008-2009","Northampton Department of Public Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/","url":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/","name":"Design of a Flow Measurement System for Avery Brook - DesignClinic","isPartOf":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#primaryimage"},"image":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#primaryimage"},"thumbnailUrl":"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW-300x200.jpg","datePublished":"2014-03-14T01:18:15+00:00","dateModified":"2022-07-12T14:06:36+00:00","author":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/#\/schema\/person\/479988d6e7c76d78aa178583ac138d1e"},"breadcrumb":{"@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#primaryimage","url":"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW.jpg","contentUrl":"https:\/\/www.science.smith.edu\/designclinic\/wp-content\/uploads\/sites\/16\/2015\/03\/0809_NDPW.jpg","width":1800,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/www.science.smith.edu\/designclinic\/2014\/03\/14\/design-of-a-flow-measurement-system-for-avery-brook\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.science.smith.edu\/designclinic\/"},{"@type":"ListItem","position":2,"name":"Design of a Flow Measurement System for Avery Brook"}]},{"@type":"WebSite","@id":"https:\/\/www.science.smith.edu\/designclinic\/#website","url":"https:\/\/www.science.smith.edu\/designclinic\/","name":"DesignClinic","description":"Smith College Engineering Capstone Course","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.science.smith.edu\/designclinic\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.science.smith.edu\/designclinic\/#\/schema\/person\/479988d6e7c76d78aa178583ac138d1e","name":"showe","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d03c572aabce3dcca290faa43b7778c013a09ba85a65bec5366e7220ea2eac3e?s=96&d=mm&r=g","caption":"showe"},"url":"https:\/\/www.science.smith.edu\/designclinic\/author\/showe\/"}]}},"_links":{"self":[{"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/posts\/345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/comments?post=345"}],"version-history":[{"count":1,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/posts\/345\/revisions"}],"predecessor-version":[{"id":1634,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/posts\/345\/revisions\/1634"}],"wp:attachment":[{"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/media?parent=345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/categories?post=345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.science.smith.edu\/designclinic\/wp-json\/wp\/v2\/tags?post=345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}